Enterprise dynamics

Sweat to write the glory of SUNLONG - the project team of Guangxi SUNLONG New Base will "charge with the sword" before the end of the year

Date of issue:2022-12-30 Source:本站

Guangxi SUNLONG New Energy Bus and Logistics Vehicle Production Project

Covering an area of about 609 mu

The building area is about 140000 square meters

The total investment is 2.408 billion yuan

Successfully put into production will release 10000 new energy buses annually

And 5000 (assembly only) logistics vehicles

There are 17 existing project management teams

12 persons under 35

This is a young team that can endure hardships, have strong fighting power and have vitality

Work hard to ensure the progress of the site project

In December, Guangxi is in the middle of winter, and the occasional drizzle is as cool as fog. Look around the construction site of the new base in SUNLONG, Guangxi. The construction work is in full swing.

图片1-gai.jpg

It was 10 o'clock at night, but the construction site was still brightly lit. The dazzling arc light of electric welding keeps splashing, and the welding flowers are scattered like stars; The roaring of machinery, the whistling of vehicles transporting materials, and the shouting of the on-site commander's walkie talkie all come together. The struggle was just at the right time. Recently, the counterattack of sporadic epidemic situation in many places failed to stop the rush to work on the project. The machines rotate endlessly, and the busy front-line construction personnel of the project "fight side by side" with the machines, together with other voices on the scene, have joined together to form a sonorous catch-up march, which has become the deep memory of the team.

According to Chen Libiao, one of the project leaders, with the strong support of leaders at all levels, the project has now completed the pouring of all workshops and individual floors in the plant area, and the construction of all plant main bodies has been completed, entering the finishing stage of the decoration project. 98% of plant greening and road construction has been completed; Except for the environmental protection equipment in the painting workshop, the equipment installation in other workshops has been completed, and the equipment installation is planned to be completed by the end of December.

Strive against time and unite to overcome difficulties

"Here are instant noodles and bread. Who wants them?"

"Help me get a bucket of instant noodles. I'm really hungry."

"I also want to soak a bucket, and then we can discuss how to solve this problem."

When the project enters the final stage of construction, facing the reality of tight time and heavy tasks, the project management team often discusses in the conference room until late at night. A bowl of steaming instant noodles can always comfort people in the simplest way at this time.

According to Li Hua, the person in charge of on-site construction management and equipment installation, in order to ensure the smooth progress of the project, the project team insists on holding a weekly staff meeting and a daily on-site construction coordination meeting to timely convey the group's determination to start a second business. Through the promotion and implementation of the corporate culture, the staff's sense of belonging to the enterprise is enhanced and the team is united.

Li Hua will hold a construction coordination meeting for everyone every day to solve the problems of subcontractors on the day and ensure the smooth construction on the site. What moved him most was that no matter on weekends or legal holidays, team members actively applied for overtime work. When there was overtime work at night, the on-site construction management even urged the construction in the first half of the night, took a rest in the office in the second half of the night, and insisted on working the next day. "It is with the dedication of the team members that today's project is about to be completed." Li Hua sighed.

Build a strong and capable team

"In the process of project promotion, we are faced with too many problems in the field construction. The most impressive thing is that after returning to the project many times at night, we can see that some offices are still lit and still working hard in the middle of the night." This is a blurted out paragraph of Chen Libiao when talking about his work experience.

图片2-gai.jpg

"All members of the project team are actively pushing forward with the goal of completing the project at the end of the year as the milestone. The future task is still arduous. I hope you will continue to work hard and continue to work hard." Chen Libiao is encouraging everyone and also suggesting himself.

In the face of the urgency and importance of the project construction, in order to effectively mobilize production and convey information, the project constantly improves the regular meeting system, unifies the ideological understanding, and mobilizes the project staff to maintain the sense of urgency of "cannot afford" and the sense of crisis of "cannot wait" at all times. Through periodic summary and analysis, we can grasp the construction progress in real time, communicate the work situation in time, and review the problems encountered, so as to clarify the "road map" of the existing work and the "mission statement" of the next plan, and build a strong team.

Think in one place and use your strength in one place. At present, all project personnel of Guangxi SUNLONG New Base are working together and taking root in their posts. Fight the rush period day and night, seize every minute to catch the progress, show the high spirit of the workers, and interpret the core enterprise concept of "dedication, work and gratitude" with practical actions.

 


Top